VALEO – VEC – GCP Arquitetos

Filed Under: Public Building  


VALEO - VEC - GCP Arquitetos


The proposed expansion and modernization of the VEC Valeo aims to solve industrial flows and improving design, industrial components adapted to current demands, and also developing the production infrastructure to future market growth.

Apart from the question of production, one of the key aspects of adaptive design is the solution of internal problems in relation to environmental existing buildings.



VALEO - VEC - GCP Arquitetos1


VALEO - VEC - GCP Arquitetos2


VALEO - VEC - GCP Arquitetos3


VALEO - VEC - GCP Arquitetos4


Due to this challenge, studies of thermal comfort, natural lighting and energy efficiency, led the solutions adopted to better integration between climate and architecture.

Considers the architectural design of buildings, both new and adapted, are reference points, presenting to the community, Valeo’s commitment to the environment and a high level of design and technology.

The use of natural lighting and ventilation, and the effect of a pound of water and vegetation cover the transparent facade square, where the meeting rooms, visitors summarizes the overall project: the eco-efficiency and high aesthetic quality and sustainable design.

The new administrative building Atibaia riverfront, where a special landscape design plan recovers the magnificence of natural forest bank.

VALEO - VEC - GCP ArquitetosVALEO - VEC - GCP Arquitetos1VALEO - VEC - GCP Arquitetos2VALEO - VEC - GCP Arquitetos3VALEO - VEC - GCP Arquitetos4